カウンター
Last modified: September 27, 2015

LIDAR project

Since 2008


New container M

Contact to: nozawa(at)isee.nagoya-u.ac.jp

Sodium LIDAR project: installation of the new container M at Ramjordmoen

Container M from September 2 to September 14, 2015
Work before installation (Sep 2, 2015) Work before installation (Sep 3, 2015) Work before installation (Sep 4, 2015)
Work before installation (Sep 6, 2015) Installation 1 (Sep 7, 2015) Installation 2 (Sep 7, 2015)
Installation 3 (Sep 7, 2015) Movie 1 (42M) (Sep 7, 2015) Movie 2 (26M) (Sep 7, 2015)
Movie 3 (41M) (Sep 7, 2015) Work after installation (Sep 9, 2015) Work after installation (Sep 10, 2015)
Work for Sep 2015 by Kawabata-san


Back to home
LINK